Project:
|
Solid Energy - Rotowaro - New Rotary Breaker at Coal Handling Plant |
Duration:
|
6 months |
Project Description:
The Rotowaro coal field is located 15mins west of Huntly and provides quality coal to the Genesis Huntly Power Station via an extensive conveyor belt system.
The coal is firstly mined in the Rotowaro open cast mine before being transported by large dump truck to the coal handling plant. The truck then empties its coal load into a vertical chute which in turn feeds the rotary breaker.
A rotary breaker consists of a large steel drum (similar to a concrete mixer) where the large pieces of coal rotate internally and smash into other pieces of coal and therefore gradually break into smaller and smaller pieces.
The steel drum has large holes in the side so that small pieces only of coal can fall through onto the conveyor belt underneath and away to the graded coal stockpiles.
The existing site rotary breaker was too small for the product throughput required and larger pieces of coal were jamming the system. Therefore Solid Energy decided to install a much larger rotary breaker with a 110KW drive motor/gearbox delivering more torque than the existing motor.
Our engineering team in association with Dobbie Engineers Ltd helped design and build a control solution that would safely ramp the motor up to full speed in a short time frame even if the rotary breaker was already full of coal.
At all times the control system is monitored via SCADA by operators in the coal grading area control station.
Work carried out included: