Hennessy Electrical | Home Client Feedback Recent Projects Services Our Team Policies Downloads Contact Hennessy Electrical

Project:


Waste Technology (NZ) Ltd - Auckland/UK - Medical Waste Incineration for Princess Elizabeth Hospital Guernsey Channel Islands, United Kingdom
Duration:

9 months

Project Description:

Hospitals produce medical waste including needles and other hazardous items
that need to be incinerated and disposed of in a safe manner.

Waste Technology (NZ) Ltd being the world leader in this field were commissioned
to design an incineration plant capable of doing this and also include a tail gas
scrubbing plant.

Due to our long standing relationship with Waste Technology and three previous
installs internationally, Hennessy Group was contracted to provide the electrical
design for this project.

Working closely with the main contractor the electrical design and assembly of
control equipment was completed and tested in New Zealand before being
exported to Guernsey.

Once the equipment had arrived on site the field installation was completed by Hennessy Staff in conjunction with Waste Technology engineers on site.

Work carried out included:

Detailed logistics and pre-planning.
Design of electrical cabinets and assembly.
Operator Control Console.
Motor Control Centre.
Field Wiring and Instrumentation.
Variable Speed Drives.
DH+ Industrial Comm Network.
Two PLC Systems.
Panelview Operator Interface Screen.
PC based SCADA System for Historical Trending
and Data Collection.
 
back to recent projects


www.whirlstream.com


HOME | TESTIMONIALS | RECENT PROJECTS | SERVICES | OUR TEAM | POLICIES | DOWNLOADS | CONTACT