Project:
|
E.S. Plastics - Relocation and
Installation of Plastics Moulding Factory and Manufacturing Plant |
Duration:
|
9 months |
Project Description:
Because of continual company growth and wanting
to integrate various
manufacturing facilities into the one production
site our client purchased a
green field site in an industrial location.
This would enable our client to provide a range of services to their
customers
from the one facility.
Being involved from the start of the project we were able to assist
our client
by designing and installing site wide underground electrical
power systems
and also lighting and power designs for their multiple
purpose built buildings
on site.
To enhance the usable space within the new premises a distributed
network
of water, air and power supplies were installed as a ring
main around the
new moulding factory.
We worked very closely with our client in the months leading up
to the relocation
date ensuring that the new purpose built facilities
would equate to a smooth
transition for the existing machinery and
plant.
This included detailing, scheduling and planning tasks for each
day as well as
site safe management for the project duration.
Work carried out included: